Subcontractors on Hornsea 1 Project for GE / Oersted. We were Project Engineers of 150 MVA Harmonic Filter for 1 218 MW Offshore Wind Farm Stage 1. It was built in North Killingholme Substation in UK. Stages 2 and 3 were developed. Stage number 4 is in planning process. Wind Farm has scheduled capacity approx. 6 000 MW.
Read MorePlatform Design for Siemens / SSE. We were involved in Platform SLD Creation, Platform Design, Switching Instructions, Transformer Design, Platform Earthing Design ...
Read MoreContractual work for GE / Oersted in 2017-2018 on this Project. We were involved in Harmonic Filter Design, Procurement, Engineering, Project Management, Contractor Selection, Contractor Supervision, Commissioning and Handover to Client.
Read MoreEmployed by Siemens / Equinor for work on Platform Design. We provided Platform SLD, Initial Studies, Calculations, Platform Design, Switching Instructions, Transformer Calculations, Platform Earthing ...
Read MoreEmployed by GE / Oersted in 2016-2017 on this Project. We were involved in Engineering, Project Management, Contractor Supervision, Commissioning and Handover to Client.
Read MoreI was employed by URS / Vattenfall in early stages of Pen y Cymoedd Onshore Wind Farm Project. I worked as a Client Engineer. I was helping to Vattenfall to select a General Contractor (Siemens won the job). I was involved in MV Cable Route Selection, work on Layout of future Substation, on Grid Connection, UK Grid Code Compliance etc.
Read MoreEmployed by GE / Vattenfall on Testing and Engineering of Grid Connection of one of the first large UK Wind Farms. It was started as a Alstom project. It was Areva and then Alstom Project again. GE bought Alstom at some stage. We were working for three companies on the same project for three years. It was very difficult to pass UK National Grid Compliance test. But it was successfully finished. We provided also O&M Manual, Tools Manual, Commissioning Support, draft of Hand-over document, As-built drawings etc.
Read MoreEmployed by Gaeltec Utilities / ESB to provide Full Design of 66 MW Onshore Wind Farm in Fullabrook, Barnstaple, UK. We provided Layout of Wind Farm, Earthing Study, Fault Level Study, Harmonic Study. We also provided full Design of the Electrical Part of 33/132 kV Substation connected by 6 km long 132 kV underground cable to WPD Barnstaple Substation. We were in the position of Electrical Engineering Consultant of the Wind Farm. We provided full Electrical Design of all Control & Protection Cabinets, MV Switchboard, 70 MVA Transformer Protection, Alarm Annunciator, etc.
Read MoreEmployed by British Solar Renewables for Grid Connection of the largest UK Solar Farm (at this time). It was the first BSR 132 kV Grid Connection to UKP Network in Southern Kent, UK. This is a massive Solar Plant with some 199 760 solar panels, producing 49 305 MWh annually. We provided Full Electric Design of 33/132kV 60 MVA Transformer, Transformer Control & Protection Cabinets, Alarm System, Signalling to UKPN Network, Protection Settings, Fault Level Study, Earthing Study, Harmonic Study, Full Design in Eplan 8 ...
Read MoreI was employed by URS, BPI and others. I was working on large number of Solar & Wind Projects. The size of these Renewable Generators was from 100 kW(p) up to 10 MW(p).
Read MoreHere could be presented your 5kW to 50 MW Renewable project once it will be fully Designed, Built, Commissioned and Handed-over to you. Hopefully this or next year. It will depend on your decision if you will like to publish it or not.
Read More